-- card: 24786 from stack: in -- bmap block id: 43216 -- flags: 0000 -- background id: 64774 -- name: Preparing a Legend -- part 10 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=57 right=124 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part 11 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=57 right=72 bottom=459 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part contents for background part 31 ----- text ----- Customizing the Charts -- part contents for background part 32 ----- text ----- Preparing a Legend for the Schedule Chart -- part contents for background part 28 ----- text ----- 1. 2. -- part contents for background part 7 ----- text ----- Set up the body of the legend by drawing a box, pasting in a graphic, or making an annotation. Choose Change to Legend from the Layout menu. -- part contents for card part 10 ----- text ----- You can have a legend in your Schedule Chart that shows the names of the attributes being displayed around task boxes. When you change any of the attributes, the names around the legend are updated automatically. -- part contents for card part 11 ----- text ----- To prepare a legend: